форма 1.11
LIST
of Scientific works of Doctor PhD, Dean of the Mining Faculty, Senior Lecturer of the Department of RMPI KSTU
Imashev Askar Zhanbolatovich from 2011 to 2017
№
п/п |
Name | Character
of work |
Output | Scope | Collaborators | |
1 | 2 | 3 | 4 | 5 | 6 | |
In an international scientific publication, included in the database of the company Scopus | ||||||
1. | Application of anchorage of mine workings in the zone of influence of the coal extraction mine in the mines of Karaganda | Printed | Russia,
«Mountain magazine» 2014. – No. 4 (2201). – P. 74-76 |
0,187 п.л.
0,04 |
Nizametdtnov F.K.,
Demin V.F., Bakhtybaeva A.S., Huanggan N. |
|
2. | Dilatancy at rock fracture | Printed | Netherlands,
“Progressive technologies of coal, coalbed methane, and ores mining” 2014. – P. 247-253 |
0,43 п.л.
0,08 |
T. Isabek,
A. Bahtybaeva, N. Nemova, A. Sudarikov |
|
В изданиях из Перечня, утвержденного Комитетом по контролю в сфере образования и науки МОН РК | ||||||
3. | Slower deposit rock in the range of application of rating classifications | Printed | Kazakhstan,
“Vesnik EKSTU them. D. Serikbaev “2016. – № 4. – P. 20-24 |
0,31 п.л.
0,06 |
Isabek T.K.
Rashid Zh.B., Akbanebetova D.E., Muratly B. |
|
4. |
Slower deposit rock in the range of application of rating classifications |
Printed | Kazakhstan,
«KazNITU Vesnik» 2017. – No. 1 (119). – P. 76-80 |
0,31 п.л.
0,06 |
Bakhtybaev N.B.,
Kuttybaev A.E., Olenyuk S.P., Muratly B. |
|
5. |
Investigation of the stress-strain state during the processing of steeply dipping veins at the Ushkatyn-3 mine |
Printed | Kazakhstan,
«Proceedings of the University», 2012. – №1. – P. 58-61 |
0,25 п.л.
0,06 |
Isabek T.K.,
Sudarikov A.E., Tileukhan N. |
|
6. | Features of fastening of mine workings in fissured rocks | Printed | Kazakhstan,
«Mountain Journal of Kazakhstan», 2013. – № 6. – P. 14-17 |
0,25 п.л.
0,05 |
Zeytinova Sh.B.,
Sudarikov A.E., Bakhtybaev N.B., Bakhtybaeva A.S. |
|
7. | Influence of fracture of rocks on the dimensions of the fracture zone in mathematical modeling | Printed | Kazakhstan,
«Industry of Kazakhstan», 2012. – №6 (75). – P. 78-81 |
0,25 п.л.
0,05 |
Sudarikov A.E., Bakhtybaev N.B.,
Tileukhan N. |
|
8. | Forecasting ore dilution during stockpiling
At the mine “Ushkatyn 3” |
Printed | Kazakhstan,
«Comprehensive use Mineral raw materials “, 2012. – № 4. – P.11-19 |
0,56 п.л.
0,14 |
Isabek T.K., Tileukhan N., Bakhtybaev N.B. | |
9. | Numerical modeling of geomechanical processes using the “Phase 2” program | Printed | Kazakhstan,
«Mountain Journal of Kazakhstan», 2013. – № 7. – P. 10-13 |
0,25 п.л.
0,05 |
Bakhtybaev N.B.,
Tileukhan N., Zhunusbekova G., Zhakanov K.K. |
|
10. | Justification of losses and dilution of the useful mineral deposit Ayak-Kodzhan | Printed | Russia,
“Izvestiya high schools. Mountain Journal », 2013. – №2. – P.12-16 |
0,31 п.л.
0,06 |
Isabek T.K.,
Serikbol A., Mukataev A.Z., Smiganovsky S.S. |
|
11. | The influence of dilatancy on the destruction of rocks | Printed | Russia,
“Coal”, 2013. № 4. – P.73-75 |
0,187 п.л.
0,04 |
Isabek T.K,
Aliev S.B., Kamarov R.K., Bakhtybaeva A.S. |
|
12. | On the maintenance of mounting strokes with combined anchor-frame fittings | Printed | Ukraine,
“Mountain Herald”, 2013. – Issue 96. – P. 13-16 |
0,25 п.л.
0,06 |
Novikov A.O.
Gladky S.Yu. Karataev A.D. |
|
13. | Solution of geomechanical problems in elastic formulation | Printed | Kazakhstan,
«Proceedings of the University», 2013. – №1. – P. 38-41 |
0,25 п.л.
0,05 |
Sudarikov A.E.,
Zeytinova Sh.B., Bakhtybaev N.B., Tileukhan N. |
|
14. | Simulation of the stress-strain state of the rock massif near the treatment units taking into account the time factor | Printed | Russia,
“Coal”, 2014 – №4. – P.71-73 |
0,187 п.л.
0,04 |
Isabek T.K.,
Aliev S.B., Kamarov R.K., Bakhtybaeva A.S. |
|
15. | Modeling of geomechanical processes around mine workings | Printed | Kazakhstan,
«Industry of Kazakhstan», 2013. – No. 2 (77). – P.56-57 |
0,125 п.л.
0,025 |
Isabek T.K.,
Sudarikov A.E. Bakhtybaeva A.S. Zeytinova Sh.B. |
|
16. | Fracture of the mountain massif and its influence on the stability of technogenic outcrops | Printed | Russia,
«Modern science and practice», 2016. – No. 4 (9) -C.43-47 |
0,312 п.л.
0,08 |
Glazunov KO,
Muratbakeev E.Kh., Sudarikov A.E. |
|
In foreign scientific publications | ||||||
17. | Problems of modeling of geomechanical processes around the excavation | Printed | Poland,
«Nauka I studia», 2013. – №2. – P.10-14 |
0,187 п.л.
0,06 |
Isabek T.K.,
Manasov Zh. |
|
18. | Definitions of stability between veins at modeling
the pulled together ore bodies |
Printed | Poland,
«Nauka I studia», 2012. – № 20. – P. 5-9 |
0,38 п.л.
0,12 |
Abdrakhmanov E.K.,
Tileukhan N. |
|
In the materials of international conferences | ||||||
19. | Implementation of the geological index of strength (GSI) for the rocks of the field “Ushkatyn-3” | Printed | Kazakhstan, International Scientific and Practical Conference “Integration of Science, Education and Production – the Basis for Implementing the Plan of the Nation” (Saginov Readings No. 7). December 10-11, 2015, KSTU, Karaganda, 2015. – P.43-44 | 0,125 п.л.
0,025 |
Bakhtybaev N.B.,
Takhanov D.K., Rashid Zh.B., Muratly B. |
|
20. | The main factors influencing find the location of wells | Printed | Kazakhstan, International Scientific and Practical Conference “Integration of Science, Education and Production – the Basis for Implementing the Plan of the Nation” (Saginov Readings No. 7). December 10-11, 2015, KSTU, Karaganda, 2015. – P.147-149 | 0,187 п.л.
0,05 |
Muratly B.,
Bakhtybaev N.B., Olenyuk S.P. |
|
21. | Ellis-3 seismic equipment to determine the capacity of the Pillars étajaralıq | Printed | Kazakhstan, International Scientific and Practical Conference “Integration of Science, Education and Production – the Basis for Realizing the Plan of the Nation” (Saginov Readings No. 8). June 22-23, 2016, KarSTU, Karaganda, 2016. – P. 86-88. | 0,187 п.л.
0,05 |
Muratly B.,
Bakhtybaev N.B., Olenyuk S.P. |
|
22. | Application of the classification classification of the rock massif in the Zhairemskoye deposit | Printed | Kazakhstan, International Scientific and Practical Conference Abishev Readings-2016 “Innovations in Complex Processing of Mineral Raw Materials”, January 21-22, 2016, Rixos Hotel, Almaty, 2016. – P.127-130 | 0,25 п.л.
0,05 |
Bakhtybaev N.B.,
Takhanov D.K., Muratly B., Rashid Zh.B. |
|
23. | “Tauro” system for building passports for fixing mine workings | Printed | Kazakhstan, International Scientific and Practical Conference Abishev Readings-2016 “Innovations in Complex Processing of Mineral Raw Materials”, January 21-22, 2016, Rixos Hotel, Almaty, 2016. – P.65-68 | 0,25 п.л.
0,06 |
Bakhtybaev N.B.,
Olenyuk S.P., Bakhtybaeva A.S. |
|
24. | Modeling of VAT around the interface in the absence of additional stresses in the array from the influence of the trunk | Printed | Russia. Materials of the III International Scientific and Technical Conference “Innovative Geotechnologies in the Development of Ore and Non-metallic Deposits”. 22-23 April 2014 – Ekaterinburg: USMU, 2014. – P. 37-40 | 0,25 п.л.
0,05 |
Sudarikov A.E.,
Bakhtybaeva A.S., Tileukhan N., Husan B. |
|
25. | Influence of fracture of rocks in determining the attachment parameters | Printed | Uzbekistan. Materials of the VI International Scientific and Technical Conference “Modern Technologies and Technologies of the Mining and Metallurgical Industry and Ways of Their Development”. 14-16 May 2013 – Navoi: NGGI, 2013. – P. 13-14 | 0,125 п.л.
0,025 |
Isabek T.K.,
Bakhtybaeva A.S., Sudarikov A.E, Tileukhan N. |
|
26. | The results of the research of the VAT of the rock massif with different coefficient of lateral pressure for the conditions of the Ushkatyn mine 3 | Printed | Kazakhstan. Proceedings of the International Scientific and Practical Conference “Science and Education is the leading factor of the” Kazakhstan-2050 “strategy (Saginov Readings No. 5). June 20-21, 2013 – Karaganda: KSTU, 2013. – P. 283-285 | 0,187 п.л.
0,04 |
Beisembaev A.M.
Isabek T.K. Abilhan B.A. Karabalayev A.D. |
|
27. | Features of the stress-strain state of the massif and stability of mine workings by the impact of blasting on the mountain massif | Printed | Kazakhstan. Proceedings of the International Scientific and Practical Conference “Innovative Technologists and Projects in the Mining and Metallurgical Complex, Their Scientific and Personnel Support”. March 18-19, 2014 – Almaty: KazNTU, 2014. – P. 350-353 | 0,25 п.л.
0,05 |
Arystan I.D.,
Isabek T.K., Sudarikov A.E., Bakhtybaeva A.S. , |
|
28. | Effect of cracks on the strength of samples in laboratory studies | Printed | Kazakhstan. Proceedings of the International Scientific and Practical Conference “Science, education and production are the leading factors of the” Kazakhstan-2050 “strategy (Saginov Readings No. 6). June 26-27, 2014 – Karaganda: KSTU, 2014. – P. 38-40 | 0,187 п.л.
0,04 |
Sudarikov A.E.,
Isabek T.K., Bakhtybaeva A.S., Imashev B.Zh. |
|
29. | Effect of cracks on the strength of samples in laboratory studies | Printed | Russia, Proceedings of the XVIII International Scientific Symposium of Students and Young Scientists named after Academician M.A. Usov “Problems of geology and mineral resources development”. 7-11 April 2014 – Tomsk: TPU, 2014. – P.433-435 | 0,187 п.л.
0,06 |
Akbanebetova D.E.,
Sadykova M.A. |
|
30. | Determination of the fracture coefficient of rocks for the conditions of the Ushkatyn-3 mine | Printed | Russia, Proceedings of the XVIII International Scientific Symposium of Students and Young Scientists named after Academician M.A. Usov “Problems of geology and mineral resources development”. 7-11 April 2014 – Tomsk: TPU, 2014. – P.435-437 | 0,187 п.л.
0,06 |
Ahmet D.M.,
Kenesov A.S. |
|
31. | Shooting of natural fracturing of rocks on the outline | Printed | Russia, Proceedings of the XVIII International Scientific Symposium of Students and Young Scientists named after Academician M.A. Usov “Problems of geology and mineral resources development”. 7-11 April 2014 – Tomsk: TPU, 2014. – P.455-456 | 0,187 п.л.
0,06 |
Manasbaeva A.K.,
Ibadullaeva A.S. |
|
32. | Investigation of the depth of the fracturing zone in the boundary part of the massif | Printed | Russia, Proceedings of the XVIII International Scientific Symposium of Students and Young Scientists named after Academician M.A. Usov “Problems of geology and mineral resources development” – Tomsk: TPU, 2014. – P.464-466 | 0,187 п.л.
0,06 |
Rashid Zh.B.,
Zhaksylykbai N.B. |
|
33. | Investigation of the influence of fracturing of rocks on the stability of the massif | Printed | Russia, the XIX International Scientific Symposium named after Academician M.A. Usov of students and young scientists “Problems of geology and development of subsurface resources”, TPU, Tomsk, 2015. – P. 427-429. | 0,187 п.л.
0,06 |
Kenesov A.S.,
Kaukenov Zh.S. |
|
34. | Analysis of the influence of the combined system for the development of ore bodies on the stability of the rock massif | Printed | Russia, the XIX International Scientific Symposium named after Academician M.A. Usov of students and young scientists “Problems of geology and development of mineral resources”, TPU, Tomsk, 2015. – P. 444-446. | 0,187 п.л.
0,06 |
Rashid Zh.B.,
Dzhusupov N.D. |
|
35. | The justification of the fastening parameters on the basis of numerical modeling results | Printed | Russia, the XIX International Scientific Symposium named after Academician M.A. Usov of students and young scientists “Problems of geology and development of mineral resources”, TPU, Tomsk, 2015. – P. 450-452 | 0,187 п.л.
0,06 |
Saparbayev S.P.,
Zhaksylykbai N.B. |
|
36. | Digital forecasting of the stability of the mine workings in the conditions of the Ushkatyn-3 mine of JSC Zhayremsky GOK | Printed | Kazakhstan. Proceedings of the International Symposium “Innovative Communication Technologies in Industry, Education and Science”. November 22-23, 2012 in 3 hours Part 3. – Karaganda: KSTU, 2012. – P. 43-45 | 0,187 п.л.
0,04 |
Bakhtybaeva A.S.
Baymuldin M.K., Baymuldin M.M., Tileukhan N. |
|
37. |
Taking into account the heterogeneity of the rock massif in determining the load on the support |
Printed | Proceedings of the International Symposium “Innovative Communication Technologies in Industry, Education and Science”. November 22-23, 2012. Karaganda, KSTU. Part 3, pp. 176-177 | 0,12 п.л.
0,03 |
Kasyan N.N.,
Baikenzhin M.A., Shynkeeva G.T. |
|
38. | Calculation of the rational type of fixing the mine workings | Printed | Proceedings of the International Symposium “Innovative Communication Technologies in Industry, Education and Science”. November 22-23, 2012 Karaganda, KSTU. Part 3, pp. 297-298 | 0,12 п.л.
0,04 |
Shestopalov I.N,
Baikengina L.T. |
|
Applicant A.Zh. Imashev
Secretary of the Academic Council А.А. Zhijite