Students take an active part in scientific,practical and social activities of the Department.
At this stage, the 2nd year students are involved in the creation of a training ground for fiber optic lines, which will be placed cross and layout of the cable well, stands on fiber optic lines, as possible will be installed layout of the communication line on analog systems. At this time, there is installation, preparation for the launch of these statics.
On the racks placed 4 Cisco switch, router, power supply to 60 V.